A due-date list shows what is overdue today. A schedule shows the next twelve months: how many gauges go out when, to which lab, at what cost – and which line is short of a gauge while it is away.

Last updated: November 6, 2026 · Reviewed by irot

  • Free for up to 20 devices
  • No payment details
  • Interface in English and German
Calibration plan
Annual calibration plan in Kalibrat

Why a plan beats a due-date list

A due-date list tells you what is overdue today. A calibration schedule tells you what the next twelve months will look like: how many gauges go out in which month, which lab gets them, what it will cost and which production lines will be short of a gauge while it is away. Without that view, calibration arrives as a series of small emergencies – three gauges in March, eleven in April, nothing in May – and the budget round in autumn is a guess.

Building the schedule, step by step

1. Start from a complete register
Every gauge with its ID, location, last calibration date and the lab that does it. Gauges missing from the register are missing from the plan – and from the budget.
2. Fix the interval per gauge
The interval drives everything else. A gauge on a six-month interval appears twice in a year, so count every due date in the period, not just the next one. See how to set calibration intervals.
3. Group by lab and month
Sort the due dates by the lab that will do the work, then by month. This is the core of the schedule: it shows where several gauges can travel together.
4. Batch the shipments
Gauges that fall due within a few weeks of each other at the same lab can go in one box. Calibrating a little early is always possible – the next interval simply starts earlier – so a window of about four weeks is a sensible compromise between effort and lost interval time. Work backwards from the first due date: ship early enough to allow for the lab's real turnaround, not the one in its quotation.
5. Plan spares and substitutes
Decide before the box leaves which gauges are covered by a spare or a loan gauge, and which jobs wait.
6. Set the budget from last year's costs
Your own invoices are the most reliable guide: the last invoice for that gauge first, otherwise what the same lab charged for the same type, otherwise the same type at other labs. Show gaps as gaps rather than counting them as zero, or the total will look more complete than it is. In-house calibration costs working time, not invoices – it belongs in staff planning rather than the lab budget.
7. Review every quarter
New gauges, scrapped gauges, changed intervals and lab price rises all move the plan. A quarterly check keeps it honest.

Gauges that cannot be away

Some gauges are used every shift, and a fortnight at the lab stops a line. Options:

  • Stagger identical gauges so that only one of a group is out at any time, instead of sending the whole set together.
  • Keep a loan or spare gauge for the critical types, itself calibrated and in the register.
  • Schedule around production – quiet weeks or shutdowns – rather than the calendar month on the label.
  • Use in-house checks between calibrations for gauges that wear fast. They do not replace the lab, but they tell you early if a gauge has drifted.

A worked example

A workshop has 120 gauges and uses three labs: one for micrometres and callipers, one for pressure and torque, and one that comes to site for the large equipment. Sorted by lab and month, the first lab's gauges turn out to cluster in March and September, so the plan makes two shipments instead of a trickle of small parcels. The second lab's gauges are spread thinly across the year; pulling the stragglers forward by a few weeks brings that down to three shipments. The site visit is booked once, for the month with the most equipment due. Last year's invoices from each lab provide the budget for each block.

Common mistakes

  • Planning only the next due date per gauge and under-counting short intervals.
  • Leaving overdue gauges at their old date instead of putting them at the start of the plan.
  • Budgeting from price lists, ignoring adjustment, minimum charges and urgent surcharges.
  • Using the lab's quoted turnaround instead of how long your last boxes actually took.
  • Sending everything at once, so that a whole department is without gauges.

If you are starting from scratch, our free calibration tracking template (.xlsx) gives you the columns, and the calibration due date calculator works out the dates for a single gauge.

The calibration schedule in Kalibrat

With the “Lab & calibration plan” add-on module, Kalibrat builds the schedule from your register: every due date in the next twelve months or the calendar year, counted per month and per lab, including repeat dates for short intervals. Gauges are grouped into shipments per lab, with a window you can choose from none up to eight weeks, and each shipment shows the date by which it has to leave – based on how long that lab has actually taken before. Estimated costs come from the invoice amounts you have recorded, with gaps shown separately; recording those amounts belongs to the “Costs & budget” add-on module, and only administrators see the figures. One click turns a shipment into a lab order, shipments due within two weeks show up on the start page, and the whole plan exports to Excel. The device register itself is free for up to 20 devices – try it with your own gauges.

FAQ

Frequently asked questions

What is a calibration schedule?

A plan of every calibration due in a period – usually twelve months – grouped by month and by the lab or person who does the work, with the expected cost. It turns a list of due dates into shipments, workload and a budget.

Can I calibrate a gauge before it is due?

Yes. The next interval then starts from the earlier date, so you lose a few weeks of interval – which is usually cheaper than an extra shipment.

How do I estimate the calibration budget?

From your own invoices: the last invoice for the gauge, otherwise what the same lab charged for the same type. Show gauges without a price as a gap, not as zero.